Skip to content
Utility submittal of electrical projects

Submitting electrical designs to the utility in Pereira and the Coffee Region

We prepare and manage the submittal of your electrical design to the distribution utility in Pereira, Dosquebradas and the Coffee Region: drawings, single-line diagram, load schedules, calculation report and responses to comments.

Tools: AutoCAD · In-house spreadsheets

Single-line diagram of a distribution panelboard with its circuits and protectionSERVICE ENTRANCEMMETERMAIN BREAKER 3×60 AMAIN BUSBAR1×20 AC112 AWG
Office lighting
1×20 AC212 AWG
Common area lighting
1×20 AC312 AWG
General receptacles
1×20 AC412 AWG
Dedicated receptacles
2×30 AC510 AWG
Air conditioning
1×20 AC6—
Spare
SINGLE-LINE DIAGRAM · MAIN PANEL208/120 V · 3F + N + TEXAMPLE VALUES
Conceptual visualization
Panelboard single-line diagram (conceptual visualization).
What it includes

Scope of the service

  • Utility requirements

    We check which documents and forms the local utility requires for the type of project and the requested load.

  • Technical package

    Drawings, single-line diagram, load schedules, calculation report and specifications, organized as the procedure requires.

  • Submittal and follow-up

    We manage the project submittal and follow up on its status until the utility responds.

  • Responses to comments

    If the utility issues comments, we adjust the documents and resubmit them within the agreed scope.

Deliverables

  • Submittal package: DWG and PDF drawings, single-line diagram, load schedules and calculation report
  • Utility forms filled in, when applicable
  • Proof of submittal
  • Documents adjusted to the comments, if any

What we need to quote

  • Property address and municipality
  • Account or meter number, if the connection already exists
  • Existing electrical design, or architectural drawings to prepare it
  • Owner or applicant details required by the procedure
  • Required load or list of equipment

Scope and clarifications

  • Approval and response times depend on the utility: ECOHIDRO cannot guarantee them.
  • Fees, payments and works required by the utility are not included unless the proposal says so.
  • If the design was prepared by a third party, it is reviewed first (Electrical analysis and review) and it is agreed who signs it as responsible engineer.
  • Design is not an inspection or a certification of the installation: conformity of a built installation is declared by the installer and, where applicable, certified by an accredited inspection body.
Frequently asked questions

About utility submittal of electrical projects

What is an electrical project submittal?

It is the formal presentation of the design to the distribution utility so it can review it before a new load is connected, an existing load is increased or networks are built. The submittal opens the procedure and the utility responds with its approval or comments.

Who receives the submittal in the Coffee Region?

The distribution utility of the municipality where the property is located. Utilities in the region include Energía de Pereira, CHEC (Caldas and most of Risaralda) and EDEQ (Quindío); we confirm which one applies and what it requires before preparing the documents.

Can you submit a design I already have?

Yes, after reviewing it. If adjustments are needed for the procedure, we let you know and quote them separately.

Do you have an electrical project under way?

Tell us what you need and we will assess the scope of the right engineering solution for your project.

A specialized division of ECOHIDRO. ECOHIDRO also supports environmental compliance, plumbing design and water treatment. [email protected]

See environmental and plumbing services